Vopak Banyan LPS 1, LPS2, LPS 3 Loading Arm
|
04-2016 |
PCS Capex II
|
04-2016 |
CCD VAE/VAEP Project
|
04-2016 |
SRC RCC Revamp Event
|
11-2015 |
Afton Chemical Maintenance Service Contract
|
10-2015 |
Construction and Pre-commissioning of 20'' Pipeline from VOPAK Banyan Terminal of Singapore to ExxonMobil
|
05-2015 |
SRC SAB RCC Air Compressor Pipeline
|
05-2015 |
411MW Combined cycle Gas Turbine Power Plant Project
|
12-2014 |
Afton Project Lion
|
11-2014 |
PAC Sub-sea Lines Re-routing to under London Bridge
|
10-2014 |
Nikko Tank Farm Extension Project
|
07-2014 |
10'' Shell C2 Pipe Line - SembCorp SCU Singapore Operations
|
06-2014 |
Construction and Pre-commissioning of Silo for Evolue No.2 Project for MES
|
05-2014 |
Instrumentation & Control System Installation Work for CGNPC Solar Biofuel Project
|
05-2014 |
Installation of a PV-Biomass Integrated Power Generation Project at Lot 04081M MK07
|
05-2014 |